In order to increase energy efficiency considerably, and to benefit from potential energy savings of between 10 and 40%, whilst also contributing to increased plant reliability, reduced equipment wear and lower operating expenses; we recommend to our clients that we carry out a full System Health Check.
Health Checks are carried out in accordance with the manufacturer’s specification which are 2 checks per year. These are scheduled in line with the inspections required under F-Gas Regulations.
- Connect Mitsubishi Heavy Industries SL Checker/ Mente PC Software via A/B Superlink/ RS232 connection
- Check connective log
- Check system fault log
- Run system in test mode cooling
- Run system in test mode heating
- Monitor operation
- Check all thermistors
- Check transducers
- Check all system valves
- Check PFD Box operation
- Check all indoor unit operation
- Check compressor operation
- Check simultaneous operation
- Check system is working within design parameters maintaining efficiency and performance
- Check refrigerant level indirectly
- Report and supply a “snapshot” in heating and cooling operations